Biogass- og slambehandlings­anlegg, CambiTHP B2

Cambi can deliver standardised thermal hydrolysis products for a wide range of capacity needs, ranging from 1 500 to 32 000 metric tons dry solids per year, for a single process train. The products take their name from the different cubic meter volumes of the batch reactors: B2, B4, B6 and B12. A process train usually has 2-4 batch reactors, so reactor feeding is uninterrupted.

CambiTHP B2 – Medina. Foto: Kenneth W. Hotz, USA

The B2 is the smallest CambiTHP model, suitable for medium-sized wastewater treatment plants. The B2 is built and delivered as a complete unit on one skid, with up to 4 reactors.

All B2 plants are fully assembled and tested in our workshop, to minimise time and work for installation and start-up on site. This makes the B2 a plug-and-play system.

Les mer på leverandørens side

Firma
Kontakt

Lars Petter Traa
Chief Commercial Officer
Mobil: +47 971 15 735
Epost: petter.traa@cambi.com
Norman Weisz
Nordic Region Manager
Mobil: +47 904 74 194
Epost: norman.weisz@cambi.com
Tord Finstad
Managing Director - Services
Mobil: +47 947 87 799
Epost: tord.finstad@cambi.com
Stikkord
Ta kontakt

Fyll ut skjemaet under så tar en av våre veiledere kontakt med deg

X

Hold deg oppdatert! Få vår ukentlige nyhetsoppdatering sendt direkte til innboksen din.

Din e-postadresse vil ikke bli brukt til å sende deg noe annet enn våre nyhetsbrev. Les mer på vår personvernside.